KISIP I

KISIP 1 Milestones/Achievements

KISIP 1 has made significant contributions towards improving the living conditions of 1,361, 320 people who have benefited from infrastructure and tenure security enhancements.

Under infrastructure interventions, 98.289km of road were constructed to bitumen standards; 120.078km of stand-alone footpaths done; 109.812km of drainage canals constructed; 21No. ablution blocks constructed; 63.048km of sewer pipeline laid with 4,788 No. connections done; 112.494km of water pipeline laid and 8,739 No. water connections done; 11 No. water kiosks constructed and 134 No. 30M high mast lighting installed.

Under tenure, a total of 23,397 titles have been prepared/ or are being prepared with 26,387 direct beneficiaries and 110,820 indirect beneficiaries.

The National Hygiene Program (Phase 1A) provided employment to 26,148 youths from 27 informal settlements in 8 counties to cushion them from the effects of Covid-19.

A county-by-county summary is shown below;

Benefited from investments in infrastructure and service delivery, enhancement of tenure security and planning for urban growth interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in two (2) informal settlements; Kayole Soweto and Embakasi KCC.

Intervention

Achievement

Roads

8.3km

High-mast lights

9 No.

Water distribution pipes

5.5km

Consumer connections

425 No

Lateral sewer lines

5.7km

Trunk sewer

526km

Sewer inspection chambers

390No

Solid waste management facility - main building and a 54m3 biogas solid waste bio digester

1 No.

 b) Enhancing Tenure Security: Planning, Survey and Titling undertaken in Seven (7) informal settlements; Embakasi, Kahawa Soweto, Kambi Moto, Mathare Fire Victims, Ex-Grogon, Mji wa Huruma and Redeemed settlements. A total of 204No. titles were prepared.

 c) Planning for urban growth: A County Housing policy was developed and handed over to the county for implementation.

 

Benefited from investments in infrastructure and service delivery, enhancement of tenure security and planning for urban growth interventions.

a) Investment in Infrastructure and Service Delivery: Implemented in four (4) informal settlements; Ziwa la Ng’ombe, Jomvu Kuu, Jomvu Mikanjuni and Mkomani.

Intervention

Achievement

Roads

3.632km

Footpaths

10.54km

High-mast lights

8 No.

Ablution blocks

7No.

Water distribution pipes

7.3km

 b) Enhancing Tenure Security: Planning, Survey and Titling undertaken in (7) informal settlements; Kindunguni, Kisumu Ndogo, Misufini, Kwa Hakatsa, Mwatate, Chaani and Likoni. A total of 3,243N0. titles were prepared.

 c) Planning for Urban growth: A County Housing policy was developed and handed over to the county for implementation.

 

Benefited from investments in infrastructure and service delivery and enhancement of tenure security interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in Three (3) Malindi sub-County settlements namely; Kibokoni, Sir Ali and Kwa Ndomo.

Intervention

Achievement

Roads

5.5km

High-mast lights

8 No.

Water distribution pipes

15km

Water connections

54No

 b) Enhancing Tenure Security: Planning, Survey and Titling undertaken in Thirteen (13) informal settlements; Kibokoni M17E, Muyeye 1, Kwa Ndomo, M26 Kibokoni, Jiwe Leupe, Makaburini, Njoro ya Chini, Shingila, Jakaba, Njoro Takatifu, Ndigwini, Tabora and Muyeye II. A total of 3,941N0. Titles were prepared.

 

Benefitted from enhancement of tenure security. Planning, Survey and Titling was done in Five (5) Informal settlements; Namu (Phase 1 and 2), Riig (Phase 1 and 2), Iskadek (Phase 1 and 2), Makhanu (Phase 1 and 2), and County (Phase 1 and 2). A total of 7,580N0. Titles were prepared.

 

Benefited from investments in infrastructure and service delivery and enhancement of tenure security interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in three (3) informal settlements in Kitui town; Mjini, Mosquito and Kunda Kindu.

Intervention

Achievement

Roads

6km

High-mast lights

6No.

Street lights

15No

Water distribution pipes

3.9km

Water connections

635No

Sewer lines

2,838m

 b) Enhancing Tenure Security: Planning, Survey and Titling done in Kaango Mosquito informal settlement. A total of 181N0. Titles were prepared.

 

Benefited from investments in infrastructure and service delivery and enhancement of tenure security interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in Dallas Informal settlement.

Intervention

Achievement

Roads

2.2km

Footpaths

400m

Drainage canals

3.9km

Main sewer

520m

Feeder sewer lines

1140m

Manholes

33No

Inspection chambers

115

 Enhancing Tenure Security: Planning, Survey and Titling in Kathita and Kimangaru Informal Settlements. A total of 304N0. Titles were prepared

 

Benefitted from enhancement of tenure security. Planning, Survey and Titling was done in Nineteen (19) Informal settlements; Gatitu, Kihatha, Kihuyo, Riamukurwe, Ithenguri, Gitathini, Gitero, Chorongi, Kiamwathi, Kiaruhiu/Kariki, Gikomo/Kiawara, Miiri, Ngorano, Gikaibei, Njoguini, Kanjora, Ruruguti, Ihwagi and Muruguru. A total of 1,837N0. Titles were prepared.

 

Benefitted from enhancement of tenure security. Planning, Survey and Titling was done in Umoja Informal settlement. A total of 63N0. Titles were prepared.

 

Benefited from investments in infrastructure and service delivery and enhancement of tenure security interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in Kwa Rhonda, Kaptembwa and Gilani informal settlements in Nakuru town and in Kihoto, Kamere, Karagita and Kasarani informal settlements in Naivasha sub-county.

Intervention

Achievement

Roads – bitumen standards

29.28km

Gravel Roads

9.5km

High-mast lights

23No

Major drains

8.1km

Roadside drains

6km

Sewer connections

230No

250m3 steel water tanks

2 No.

Water pipelines

29.5km

Consumer connections

1,426No.

Water kiosks

10 No.

Submersible water pumps

2 No

Water office

1 No.

Solid waste management Facility

1 No.

 b) Enhancing Tenure Security: Planning, Survey and Titling undertaken in Six (6) informal settlements; Kasarani A&B, Eastleigh, Tarabete, Keringet, Kong’asis and Crater Lake. A total of 3,317No. Titles were prepared.

 

Benefited from investments in infrastructure and service delivery and enhancement of tenure security interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in Hill School, Kimumu/Hawaii, Kimumu/Kambi Nairobi, Race Course, Munyaka, Huruma and Kamukunji informal settlements.

Intervention

Achievement

Roads

18.5km

High-mast lights

16No.

Ablution blocks

7No.

Mobile garbage skips

9No.

 b) Enhancing Tenure Security: Planning, Survey and Titling undertaken in Three (3) informal Settlements; Hill School, Maili Nne and Kuinet. A total of 517N0. Titles were prepared.

 

Benefited from investments in infrastructure and service delivery and enhancement of tenure security interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in Talai, Motobo and Swahili informal settlements.

Intervention

Achievement

Roads

5.4km

High-mast lights

6No.

 b) Enhancing Tenure Security: Planning, Survey and Titling undertaken in Swahili Village and Majengo Talai informal Settlements. A total of 472 N0. Titles were prepared.

Benefited from investments in infrastructure and service delivery, enhancement of tenure security and planning for urban growth interventions.

 a) Investment in Infrastructure and Service Delivery: Implemented in Nyalenda, Obunga, and Bandani, informal settlements.

Intervention

Achievement

Roads

7.4km

High-mast lights

37No

Trunk sewer

6km

Lateral sewer

2.1km

Manholes

358 No

Sewer pumps and pumping station

3No.

KIWASCO sewer treatment works

2No

 

b) Enhancing Tenure Security: Planning, Survey and Titling undertaken in Six (6) informal Settlements; Bondeni, Swahili, Shauri Yako, Kaloleni, Shauri Moyo and Kopere. A total of 1,411N0. Titles were prepared.

c) Planning for urban growth: A County Housing Policy was developed and handed over to the county for implementation.

 

Benefitted from enhancement of tenure security. Planning, Survey and Titling was done in Three informal settlements; Kambi Somali, Mjini and Amalemba. A total of 327N0. Titles were prepared.

Benefitted from investment in infrastructure and service delivery in Kariobangi and Swahili informal settlements in Machakos town.

Intervention

Achievement

Roads

1.889km

High-mast lights

4No.

Trunk sewer

1.6km

Lateral sewer line and rehabilitation of sewer ponds at Machakos Girls

4km

Pumping and equipping boreholes

2No.

250m3 elevated steel water tank

1No.

Water main pipelines

700m

Sewer distribution lines

8.7km

Solid waste management facilities

2 No.

Implementation of the National Hygiene Programme (Kazi Mtaani)

The project funded the implementation of the first phase (1A) of Kazi Mtaani, an initiative of the Government to cushion the most vulnerable population from the effects of COVID-19 pandemic.

This first phase (1A) focused on Twenty-Seven (27) informal settlements in eight (8) counties of Nairobi, Mombasa, Kiambu, Nakuru, Kisumu, Kilifi, Kwale and Mandera as tabultated below;

S/No

County

Number of Workers

No of Settlements

Informal Settlements

1. 

Nairobi

10,600

4

Mathare, Kibera, Mukuru, Korogocho

2. 

Mombasa

6,000

3

Bangladesh, Kaa Chonjo, Ziwa la Ngombe

3. 

Kiambu

2,300

5

Kiandutu, Kiangombe, Shauri Yako-Uthiru, Shauri Yako - Kinoo, Kibagare

4. 

Nakuru

2,300

4

Kaptembwa, Kwa Rhonda, Lakeview, London

5. 

Kisumu

2,300

5

Manyatta (A & B), Nyalenda (A&B), Obunga

6. 

Kwale

1,000

2

Karanja Estate, Whitehouse (Diani)

7. 

Kilifi

1,000

2

KKB, Jakaba (Mariakani)

8. 

Mandera

648

2

Bulla Jamhuria, Shafshafey

Total

26,148

27

 

 A total of Twenty-Six Thousand, One Hundred and Forty-Eight (26,148) youths benefited from the programme earning a daily wage of Kshs. 653.10 in cities and Kshs. 600 in other areas